boiler is not specified in special equipment

Subject 120-3-26 RULES AND REGULATIONS FOR BOILERS AND ...

No boiler or unfired pressure vessel shall be installed in a system or operated in a service that the boiler or pressure vessel is not designed and manufactured to the intended service (as specified on the data report or receive a State Special Permit for that intended service).

Learn More

Pennsylvania Bulletin

Both commentators noted that the effective date of the boiler control requirement in § 3a.24 (relating to boiler controls) was not specified. The Department added language to subsection (a) stating that ''installation of boiler controls after February 4 2006 must comply with ASME CSD 1 and NFPA 85.''

Learn More

Department of Labor and Workforce Development | Boilers ...

Any owner lessee seller or operator of any steam or hot water boiler or similar equipment specified in R.S. 34:7-14 pressure vessel or refrigeration system who shall sell use cause or allow to be used such steam or hot water or similar in R.S. 34:7-14 pressure vessel or refrigeration system in violation of any provision of this article shall be liable to a penalty of less than $500.00 nor more than $10000.00 for each first offense and

Learn More

Gas-Fired Boilers - Code Compliance Brief | Building ...

Mounting. Verify equipment is correctly supported and installed in the structure. 2015 IRC Section G2408.4 Clearance from grade. Equipment and applications supported from the ground should be level and firmly supported on a level concrete slab or other approved material extending less than 3 inches (76 millimeters) above adjoining grade or should be suspended less than 6 inches ...

Learn More