Boilers and Unfired Pressure Vessels

At the time that the required hydrostatic test occurs you must submit a fully completed copy of the CAST IRON BOILER INSTALLATION REPORT (LIBI-236) for each unit to be installed. The hydrostatic test will be conducted at 1½ times the Minimum Allowable Working Pressure for hot water boilers and 45