change user boiler inspection report

SCLLR

Boiler inspection reports performed by special inspectors on or after April 2 2006 may be submitted to the department on line beginning June 1 2006 provided the inspector has attached a department boiler registration tag number to the boiler.

Learn More

Inspections - TSSA

Alteration inspections may also apply to boilers and pressure vessels. Alterations include: Any change in the item described on the original Manufacturers Data Report that requires a change of design calculations or otherwise affects the pressure containing capability of a BPV

Learn More